Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8617822

- Product Categories
- Friendly Links
- home > Supply > Supply Yueyang public building planning and design, we have chosen Green Bor Design Institute!
Information Name: | Supply Yueyang public building planning and design, we have chosen Green Bor Design Institute! |
Published: | 2011-12-20 |
Validity: | 30 |
Specifications: | |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | Yueyang public construction planning and design, we have chosen the Green Bor Design Institute! With the continuous development of society, the people of the units on the residential design and planning requirements are getting higher and higher, the living environment, building exterior, space standards, space layout is increasingly becoming the focus of attention, green and healthy concept of Habitat been firmly established. So how to build a living environment to meet human health standards, how to build a residential district to benefit human health? Green Bor Design Group Co., Ltd., Hong Kong, HONGKONG the GREEN the PLANET DESIGN GROUP LIMITED, Founded in Hong Kong and set up branches in Shenzhen, China and other places, the business scope includes: architectural design, urban design, planning and design, landscape design, environmental design, interior design, municipal design and technical advice, project planning and management. We are adhering to the professional, efficient design attitude, take seriously each one designed the whole situation, to ensure the continuity of planning and construction to environmental design. The design concept of the international background, a wide range of design teams from different regions experienced design elite. In China's domestic management model, the implementation of the headquarters in Hong Kong, Shenzhen, Shenzhen company to provide technical support with an international perspective, to co-ordinate the planning of each project to ensure that the design results most in line with national conditions and efficient and all-round professional service quality. With the rapid growth of the company's business, we continue to adhere to the attitude of enthusiasm and professionalism to provide customers with more high-quality and creative design services, and the pursuit of excellence, customers rely on partners. And efforts to enhance self-improvement to compete for the market of global competition, the creation of the brand in the field of design, to contribute to the construction industry. Company Name: Green Bor Design Group Co., Ltd. The following information is for reference only, without our services: The more difficult problem in the construction. The reason: the upper reinforced plate is thinner than the soft, by stampede after the bending and falling; reinforced the height from the floor template, you can not By relying on protection of template; cross-operation of various types of work, resulting in many construction workers walking very frequent nowhere settled will inevitably be a large number of stampede; upper steel mesh reinforced to support the horse set spacing is too Not even located only rely on the floor beam upper reinforced shelving and separate reinforcement Shui foot support. Two embedded-ray tube at the crack control embedded line pipe, line pipe distribution at cross section of concrete by To more weakened, causing stress concentration easily lead to cracks in the weakest part of. When the smaller diameter tube pre-cable management, and the bay width of the housing smaller, while the line pipe laying toward Not more important than perpendicular to the concrete shrinkage and the tensile direction, like does not occur floor cracks. Conversely, when the embedded line pipe of larger diameter, the bay width, and line pipe laying toward weight Suitable for concrete perpendicular to the contraction and the tension, it is prone to floor cracks. Therefore, for thicker pipeline or at the distribution line pipe shall be technical guidelines required by three, four additional Perpendicular to the ray tube short steel mesh to strengthen. According to my company's experience, it is recommended that additional crack short reinforced Φ6-Φ8 spacing ≤ 150, both ends of the anchorage length should be not less than 300 mm Meters. Three materials crane unloading regions floor Cracks in the main structure of the construction process, the prevalence of larger contradiction between the quality and duration. Like the main structure of floor construction and the average speed Layer about 5-7 days, the fastest or even days layer. Thus, when the curing time of less than 24 hours after the floors Pouring on the busy steel banding material lifting and other construction activities, which Yueyang public construction planning and design, we have chosen the Green Bor Design Institute! |
Admin>>>
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility