Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8617822
- Product Categories
- Friendly Links
- home > Supply > Supply of the Sanming industrial park planning and design, or Green Bor Design Institute
Information Name: | Supply of the Sanming industrial park planning and design, or Green Bor Design Institute |
Published: | 2011-12-30 |
Validity: | 30 |
Specifications: | |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | The Sanming industrial park planning and design, or Green Bor Design Institute With the continuous development of society, the people of the units on the residential design and planning requirements are getting higher and higher, the living environment, building exterior, space standards, space layout is increasingly becoming the focus of attention, green and healthy concept of Habitat been firmly established. So how to build a living environment to meet human health standards, how to build a residential district to benefit human health? Green Bor Design Group Co., Ltd., Hong Kong, HONGKONG the GREEN the PLANET DESIGN GROUP LIMITED, Founded in Hong Kong and set up branches in Shenzhen, China and other places, the business scope includes: architectural design, urban design, planning and design, landscape design, environmental design, interior design, municipal design and technical advice, project planning and management. We are adhering to the professional, efficient design attitude, take seriously each one designed the whole situation, to ensure the continuity of planning and construction to environmental design. The design concept of the international background, a wide range of design teams from different regions experienced design elite. In China's domestic management model, the implementation of the headquarters in Hong Kong, Shenzhen, Shenzhen company to provide technical support with an international perspective, to co-ordinate the planning of each project to ensure that the design results most in line with national conditions and efficient and all-round professional service quality. With the rapid growth of the company's business, we continue to adhere to the attitude of enthusiasm and professionalism to provide customers with more high-quality and creative design services, and the pursuit of excellence, customers rely on partners. And efforts to enhance self-improvement to compete for the market of global competition, the creation of the brand in the field of design, to contribute to the construction industry. Company Name: Green Bor Design Group Co., Ltd. The following information is for reference only, without our services: Technical and economic comparison of steel panel two templates using stereotypes concrete composite steel panel as the number of bridge engineering substructure concrete formwork turnover stiffness watering tables and engineering experiments to prove Smooth surface and good appearance. After the selection of the formwork system to calculate the thickness of the back rib section of the plate and spacing rod model and the spacing and support system according to the size of the load. The calculated loads including concrete pressure The impact of the lateral pressure of concrete pouring and construction loads. Mechanical calculations for the main force component calculation and checking of the deflection and deformation of the component. Main components can be designed by experience necessary When checking. Concrete structures using stereotypes combined steel formwork panel thick plus steel rib spacing for each device template patchwork of glass, plastic or seal coated with paste. Cast accurately measured template line and steel The tendons position coordinated the first step in ensuring the quality of structural appearance. The bridge project template positioning control elevation Level edge Wai Yee verticality of the laser vertical instrument control. Vertical degree of Available hanging wire fall control before carrying out the next process with theodolite outside the control method check. Bridge engineering structures reinforced to maintain the layer control should be using plastic pads should not be using cement mortar pad or in water The concrete surface will leave the shape of the scar appearance of defects. Maintained for pier columns without using the layer pads, but measures should be taken to produce reinforcement cage stiffening hoop spacing not greater than the reinforcement cage is facing welding positioning Tendons general reinforcement cage of the Φ reinforced accurate device and check the verticality of the template and then the device and re-check the verticality of competence Concreting Concreting every certain height of fall with hanging wire was observed control The Sanming industrial park planning and design, or Green Bor Design Institute |
Admin>>>
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility