Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8617822

- Product Categories
- Friendly Links
Information Name: | Supply the Changsha standard plant program design, or Green Bor good |
Published: | 2012-02-15 |
Validity: | 30 |
Specifications: | |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | Changsha standard plant design, or Green Bor good With the continuous development of society, the people of the units on the residential design and planning requirements are getting higher and higher, the living environment, building exterior, space standards, space layout is increasingly becoming the focus of attention, green and healthy concept of Habitat been firmly established. So how to build a living environment to meet human health standards, how to build a residential district to benefit human health? Green Bor Design Group Co., Ltd., Hong Kong, HONGKONG the GREEN the PLANET DESIGN GROUP LIMITED, Founded in Hong Kong and set up branches in Shenzhen, China and other places, the business scope includes: architectural design, urban design, planning and design, landscape design, environmental design, interior design, municipal design and technical advice, project planning and management. We are adhering to the professional, efficient design attitude, take seriously each one designed the whole situation, to ensure the continuity of planning and construction to environmental design. The design concept of the international background, a wide range of design teams from different regions experienced design elite. In China's domestic management model, the implementation of the headquarters in Hong Kong, Shenzhen, Shenzhen company to provide technical support with an international perspective, to co-ordinate the planning of each project to ensure that the design results most in line with national conditions and efficient and all-round professional service quality. With the rapid growth of the company's business, we continue to adhere to the attitude of enthusiasm and professionalism to provide customers with more high-quality and creative design services, and the pursuit of excellence, customers rely on partners. And efforts to enhance self-improvement to compete for the market of global competition, the creation of the brand in the field of design, to contribute to the construction industry. Company Name: Green Bor Design Group Co., Ltd. Web site: www.sztdt.com/ The following information for reference only and has nothing to do with our services: Site preparation the lower part of the laying of steel plate to the upper placed on steel horses bench first steel column size Measure for Horn adjust steel elevation draw the line of control. Repeated measurements of the steel column corbels placed on top of the steel columns to The capitals of the distance. By retest error-free jack and hand chain hoist control the pillar to prevent its deformation in the assembly and welding. Sunroof frame on-site assembly skylight frame size is particularly large if the existing Field assembly error is too general to give a follow-up pressure plate installation create great difficulties for the site constraints, but in the assembly process must be strictly controlled shape and size of the skylight frame hanging in the assembly Loaded assembly and take the temporary support measures. Steel installation and construction of steel columns hoisting site dynamic compaction after foundations have not yet returned to fill out, and other underground structures under construction, so hoisting machinery can not be Completely close to be based only on the selection of crawler cranes. The crane beam system, roof system component size were selected crawler cranes and vehicle hoists. Lifting all components should do the play line and centerline of the mark steel columns Fixed straight ladder ready to wind cable rope wedge theodolite and other installation appliances retest foundation play basis centerline. Steel column system installation. Steel columns hoisting the use of stand-alone rotation method. Lifting sequence from south To north, from west to east under the backfill situation local adjustment. Steel columns hoisting preliminary adjustment of the deviation with the fine-tuning of the initial fixed term wind cable rope and then wedge. Steel column correction from the following aspects: security Changsha standard plant design, or Green Bor good |
Admin>>>
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 47572 visitor
Copyright © GuangDong ICP No. 10089450, Green Design Group Co., Ltd. Hong Kong Bor All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility